Networked Lighting Controls

In stock
$0.00
This incentive is available for the installation of a central/master front end system with room or fixture level lighting control.

Out Of Stock

You have a saved application!

Required Documentation:
  • Spec sheets for new control system
  • Existing and proposed operating schedule.
  • Proposed lighting control strategies.
  • Projects >100,000 sf must export kWh readings from control system in an excel spreadsheet with maximum of 15 minute intervals over a 2 week period.
Important Consideration:
  • Sites with existing lighting control or non-DLC listed systems may be eligible through the custom pathway.
  • Applicability: Eligible for retrofit or certain new construction projects.
  • Baseline Efficiency: Existing lighting systems without existing lighting controls.
  • Qualifying Efficiency Requirement:
    • Lighting control system must be Design Lights Consortium (DLC) listed.
    • System must be centrally controlled with a reporting interface that is connected via hardware and/or wirless technology to all devices and luminaires both interior and exterior spaces.
    • At least 3 efficient control strategies should be implemented such as occupancy sensing, daylight sensing, high end trim, luminaire level lighting control.