Process Ventilation Reduction - Gas
In stock
$0.00
This incentive is available for facilities that are permanently reducing cooling season manufacturing or process ventilation volume flow rates through facility or process improvements.
You have a saved application!
You can either continue where you left off or start over. Starting a new application will delete your saved progress.
- The reduced volume flow rate must exceed 5,000 cubic feet per minute and serve conditioned (cooled) spaces.
- Significant changes of operational use (i.e., factory to warehouse) do not qualify for this incentive.
- Systems designed to allow the carbon dioxide (CO2) levels in occupied spaces to exceed a maximum level of 1,200 ppm do not qualify.
- The reduced volume flow rate levels must also comply with the local and/or state authority having jurisdiction.
- Decreases in ventilation rates of HVAC systems must be authorized by a professional engineer (PE) or a certified industrial hygienist (CIH).
- Operational performance verification (complete pre-construction and post-construction volume flow rate testing) by certified testing, adjusting, and balance (TAB) agents are required to qualify for this incentive. TAB agents shall be an independent testing, adjusting, and balancing professional services provider certified by either Associated Air Balance Council (AABC) or National Environmental Balancing Bureau (NEBB).